With the new branding finalised, Berwick was the last clinic to be completed. Exterior, stairwell and reception areas need to be updated. To minimise cost, the glass splashback would remain and we would mount alucobond sheets with cut vinyl ontop, We used construction grade double sided tape and learnt that hard way how tacky it was. The old adage of measure twice, cut/paste once definitely rung true. The front reception desk mounted with stand-offs would be replaced with a same style finish.
3D Sign Solutions BLOG
BLOG of our jobs. Archives
June 2022
Categories |