3D Sign Solutions
  • Home
  • Services & Clients
  • Gallery
  • Artwork Specs
  • About us
  • Blog
  • Contact Us

Victoria Cosmetic Institute & Presidian Berwick

15/8/2013

1 Comment

 
Picture
With the new branding finalised, Berwick was the last clinic to be completed.  Exterior, stairwell and reception areas need to be updated.  To minimise cost, the glass splashback would remain and we would mount alucobond sheets with cut vinyl ontop,  We used construction grade double sided tape and learnt that hard way how tacky it was.  The old adage of measure twice, cut/paste once definitely rung true.  The front reception desk mounted with stand-offs would be replaced with a same style finish.   

Picture
Doncaster reception rear - before
Picture
Doncaster reception rear - after
Picture
Doncaster reception front - before
Picture
Doncaster reception front - after
Picture
Berwick reception - before
Picture
Berwick reception - after
Picture
outside signage - before
Picture

Original Stairwell.

Using alucobond as a backing sheet. We advised the client that it would be a great contrast to have them separate. It would be a slight additional cost, but would have a better individual finish.


All works kept in house to maximise quality control. Site left clean upon completion. Notified staff of impending works to minimise any disruption to staff as wall was concrete and required hammer drill to use stand-offs.
Picture
outside signage - after
Picture
Picture
1 Comment
Sara
11/9/2017 05:24:34 pm

Hey

Reply



Leave a Reply.

    3D Sign Solutions BLOG

    BLOG of our jobs.

    Archives

    June 2022
    June 2019
    May 2019
    June 2017
    May 2017
    March 2017
    December 2016
    August 2016
    July 2016
    March 2016
    July 2015
    June 2014
    November 2013
    August 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013

    RSS Feed

    Categories

    All

Powered by Create your own unique website with customizable templates.